• Home
  • Services
    • Turnkey Pipeline (Re)Qualification and Rehabilitation
    • Pipeline Integrity Testing
    • Anomaly Digs
    • Nitrogen Services
    • Flaring
    • Facility Testing & Dehydration Services
    • Other Services
  • About Us
  • Resources
    • Case Studies & Articles
    • Calculators
      • HDPE Piping Volume Calculator
      • HDPE Piping Pneumatic Volume Calculator
      • Carbon Steel Piping Volume Calculator
      • Carbon Steel Piping Nitrogen Volume Calculator
      • Carbon Steel Piping Nitrogen Purge and Pack Calculator, 2x Volume Changeover
  • Contact Us
  • Request Our Project Resume
PL Testing
Linkedin

(979) 716-0017

1334 Brittmoore Rd, Houston, TX 77043

  • Home
  • Services
    • Turnkey Pipeline (Re)Qualification and Rehabilitation
    • Pipeline Integrity Testing
    • Anomaly Digs
    • Nitrogen Services
    • Flaring
    • Facility Testing & Dehydration Services
    • Other Services
  • About Us
  • Resources
    • Case Studies & Articles
    • Calculators
      • HDPE Piping Volume Calculator
      • HDPE Piping Pneumatic Volume Calculator
      • Carbon Steel Piping Volume Calculator
      • Carbon Steel Piping Nitrogen Volume Calculator
      • Carbon Steel Piping Nitrogen Purge and Pack Calculator, 2x Volume Changeover
  • Contact Us
  • Request Our Project Resume

Resources

Liquid Volume Calculators

Carbon Steel Piping Volume Calculator
HDPE Piping Volume Calculator
HDPE Piping Pneumatic Volume Calculator

Case Studies & Articles

Vintage Pipeline Pig
Article

Managing and Maintaining Existing Transmission Pipeline Assets

Read More »
December 14, 2023
Gas pipeline running parallel to the road
Case Study

Tracking Pipelines: The Role of XYZ Mapping

Read More »
November 30, 2023
Inserting a brush pig into a pipe
Article

How Smart Pigging is Shaping Pipeline Integrity Management

Read More »
October 31, 2023
Map of PG&E owned lines in San Bruno
Case Study

The Importance of Hydrostatic Testing: Lessons From the San Bruno Incident

Read More »
October 19, 2023
Pipeline Testing by a waterway
Case Study

Where There’s Water, There’s A Way

Read More »
September 28, 2023
Uncovered pipeline in mud
Article

What to Know About Existing Asset Requalification

Read More »
August 31, 2023
Page1 Page2

CONTACT US

  • (979) 716-0017
  • 1334 Brittmoore Rd
    Houston, TX 77043
Linkedin

SERVICES

ABOUT US

RESOURCES

EVENTS

LATEST RESOURCES

Pipe being excavated during the project
April 25, 2024-0 comments

Protecting Transmission Lines: Mitigating Risks of Third-Party Damage

Close up of stainless steel hoses
February 29, 2024

CNG Hose Integrity Management

© PL Testing 2024 | Privacy Policy & Terms and Conditions | Website by ADV Marketing