Turnkey Pipeline Requalification Services

Extend the lifespan of your assets while maintaining safety, reliability, and compliance with API 1163 and 49 CFR Part 192.

PL Testing provides turnkey requalification and testing solutions that help operators meet regulatory standards and keep lines operating efficiently. Headquarter in Houston, Texas, with yards in Odessa and Giddings, our team is equipped to service Texas and the surrounding states, including Oklahoma, New Mexico, and Louisiana.

Stay Ahead of
Regulatory Demands

Contact Us for More Information

Paul Daniel

Vice President – Operations

Paul.daniel@pltesting.com

Mobile: 832-797-4819

Vintage Pipeline Pig

Managing and Maintaining Existing Transmission Pipeline Assets

Over half of the 300,000 miles of transmission pipelines in the United States were manufactured before 1970, making a majority of the pipeline infrastructure over 50 years old. Existing assets, if properly maintained and inspected at regular intervals, can function well and perform the necessary function to transport liquids or gases despite older manufacturing techniques.

Read More »
Vintage Pipeline Pig

Managing and Maintaining Existing Transmission Pipeline Assets

Over half of the 300,000 miles of transmission pipelines in the United States were manufactured before 1970, making a majority of the pipeline infrastructure over 50 years old. Existing assets, if properly maintained and inspected at regular intervals, can function well and perform the necessary function to transport liquids or gases despite older manufacturing techniques.

Read More »
Pipeline pig in a truck bed

The Diameter Dilemma: Pigging a Multi-Diameter Pipeline

When lines are modified and added to existing assets, the diameter may differ between lines. Many multi-diameter lines can be classified as unpiggable, making cleaning and inspecting these lines a challenge. A large midstream company’s line had undergone a revision around 10 years prior, with a 6-inch diameter installed line. The new addition was placed between two 4-inch diameter lines. This project was also located in a high-consequence area, underneath an intersection of two major highways.

Read More »
Pipeline pig in a truck bed

The Diameter Dilemma: Pigging a Multi-Diameter Pipeline

When lines are modified and added to existing assets, the diameter may differ between lines. Many multi-diameter lines can be classified as unpiggable, making cleaning and inspecting these lines a challenge. A large midstream company’s line had undergone a revision around 10 years prior, with a 6-inch diameter installed line. The new addition was placed between two 4-inch diameter lines. This project was also located in a high-consequence area, underneath an intersection of two major highways.

Read More »

Your First And Only Call

We offer a full suite of services including:

Your First And Only Call

We offer a full suite of services including:

Locations

Houston Location

1334 Brittmoore Rd Houston, TX 77043

Giddings Location

1080 Private Rd 7703 Giddings, TX 78942

Odessa Location

3415 Rasco Ave Odessa, TX 79764