• Home
  • Services
    • Turnkey Pipeline (Re)Qualification and Rehabilitation
    • Pipeline Integrity Testing
    • Anomaly Digs
    • Nitrogen Services
    • Flaring
    • Facility Testing & Dehydration Services
    • Other Services
  • About Us
  • Resources
    • Case Studies & Articles
    • Calculators
      • HDPE Piping Volume Calculator
      • HDPE Piping Pneumatic Volume Calculator
      • Carbon Steel Piping Volume Calculator
      • Carbon Steel Piping Nitrogen Volume Calculator
      • Carbon Steel Piping Nitrogen Purge and Pack Calculator, 2x Volume Changeover
  • Contact Us
  • Request Our Project Resume
PL Testing
Linkedin

(979) 716-0017

1334 Brittmoore Rd, Houston, TX 77043

  • Home
  • Services
    • Turnkey Pipeline (Re)Qualification and Rehabilitation
    • Pipeline Integrity Testing
    • Anomaly Digs
    • Nitrogen Services
    • Flaring
    • Facility Testing & Dehydration Services
    • Other Services
  • About Us
  • Resources
    • Case Studies & Articles
    • Calculators
      • HDPE Piping Volume Calculator
      • HDPE Piping Pneumatic Volume Calculator
      • Carbon Steel Piping Volume Calculator
      • Carbon Steel Piping Nitrogen Volume Calculator
      • Carbon Steel Piping Nitrogen Purge and Pack Calculator, 2x Volume Changeover
  • Contact Us
  • Request Our Project Resume
  1. Home
  2. 2024

Year: <span>2024</span>

Streamlining Pipeline Maintenance through Turnkey Services and Partnerships
May 30, 2024

Streamlining Pipeline Maintenance through Turnkey Services and Partnerships

A large midstream client needed a requalification of a 6-inch diameter natural gas liquids transportation line in a coastal environment. The line had last been recertified 7 years prior and
Streamlining
Protecting Transmission Lines: Mitigating Risks of Third-Party Damage
April 25, 2024-0 comments

Protecting Transmission Lines: Mitigating Risks of Third-Party Damage

Today, millions of people unknowingly live and work near pipelines. Transmission lines that were once installed over 60 years ago in largely uninhabited areas are now closer to bustling communities
Nitrogen Integrity Testing of a Non-Piggable Gas Processing Line
March 28, 2024

Nitrogen Integrity Testing of a Non-Piggable Gas Processing Line

The Need for Nitrogen Testing A midstream operator was looking to pneumatically test its gas processing line. Due to the structure of the line, the line was classified as non-piggable.
CNG Hose Integrity Management
February 29, 2024

CNG Hose Integrity Management

A common ancillary asset used in oil and gas is temporary transmission hoses for virtual pipelines, often those that transport compressed natural gas (CNG). With asset management, it’s important to
Ancillary AssetsRequalification
The Diameter Dilemma: Pigging a Multi-Diameter Pipeline
January 30, 2024

The Diameter Dilemma: Pigging a Multi-Diameter Pipeline

When lines are modified and added to existing assets, the diameter may differ between lines. Many multi-diameter lines can be classified as unpiggable, making cleaning and inspecting these lines a
Diameter

CONTACT US

  • (979) 716-0017
  • 1334 Brittmoore Rd
    Houston, TX 77043
Linkedin

SERVICES

ABOUT US

RESOURCES

EVENTS

LATEST RESOURCES

Pipe being excavated during the project
April 25, 2024-0 comments

Protecting Transmission Lines: Mitigating Risks of Third-Party Damage

Close up of stainless steel hoses
February 29, 2024

CNG Hose Integrity Management

© PL Testing 2024 | Privacy Policy & Terms and Conditions | Website by ADV Marketing